Showing posts with label Almost finished... the only thing left to cover is the door of the tunnel.. Show all posts
Showing posts with label Almost finished... the only thing left to cover is the door of the tunnel.. Show all posts

Monday, October 8, 2007


The tunnels are 9m x 4m in size and are manufactured of plastic pipe and 40% density shade cloth. They are supplied complete with everything needed to start. This includes all the necessary minerals and either spinach or tomato plants, brinjals, beans, cabbages, etc... And the wonderful news is that no running water or good soil is needed as they grow in saw-dust.